Garden State Parkway Exit 105 Monthly Update: 12/20/23

The message below contains important project updates for the GSP Interchange 105 Improvement Project and will be posted on a monthly basis.

FOUR WEEK SCHEDULE AS OF 12/20/23:

Work Area C – Str. 106.4I & Str. 106.4NO – Ramp E3, South Bound Inner Lanes Exit

  • This stage is considered substantially complete.

Work Area D – Str. 106.5NO – Ramp E7, North Bound Inner Entrance

  • This stage is considered substantially complete.

Work Area A – Str. 106.3I, Str. 106.4NO and Str. 106.4A – Ramp E1, South Bound Entrance

  • This stage is considered substantially complete.

Work Area B – Str. 106.4I, Str. 106.4NO and Str. 106.4 SO – Ramp E2, South Bound Outer Lanes Exit

  • The ramp will be opening 12/21/20 by 5 AM.
  • This stage will be substantially complete upon opening of the ramp.

SBO to SBI (Local to Express) Crossover – MP 108.6

  • The crossover will be removed starting the end of January.